| Putting up the forms for the basement walls. |
| The basement wall ready to pour the concrete. |
| Bracing to hold the basement walls (when the concrete is poured). |
| Cleaning up around the work site. |
| Another cleanup shot. |
| The forms for the upper basement wall. |
| Forming the garage walls |
| Another view of the garage forms. |
| The lower east wall, with the 'French Drain' done. |
| The lower west wall is completed. |
| Putting in rebar for the Garage. |
| Carrying some Rebar. |
| The upper slabs are ready for the conrete. |
| The conrete trucks are lined up ready to pour |
| Pouring concrete into the footings |
| Pouring the north wall. |
| Two concrete trucks unloading into the pumper truck. |
| Brians is checking out the newly poured floor. |
| The completed foundation. It took them 5 weeks. |