| Getting the dozer ready for a hard days work. |
| The first day they cleared the site and the driveway some. |
| They've cleared where the house will sit. |
| Digging the hole for the basement. This was after one day of digging. So far they are making good progress. |
| Here is a pile of limestone rocks that have been broken up in chunks to be hauled off. |
| This is after 3 days of digging. The walkout-basement is almost dug out (of the rock). Hopefully they will be finished after one more day of digging (due to the expense). The left side is finished, the right needs lowered another foot or so. |
| So what are they doing with all the rock? Here it is. This was a ravine. Now it matches the back slope of the house. They will need to cover it with dirt so we can plant grass there. |
| My son on the backhoe |
| My son on the hood of the backhoe. |
| My son on the dozer. |
| The pit has been excavated! |
| My son checks out the rock wall. |